Heinz Ehrbar worked for AlpTransit Gotthard Ltd. and Electrowatt Engineering Ltd. in key functions on the following projects:

AlpTransit Gotthard, Gotthard Base Tunnel

AlpTransit Gotthard, Gotthard Base Tunnel

GOTTHARD – BASE TUNNEL The Gotthard Base Tunnel is currently the longest railway tunnel in the world, with a length of 57 km. It is part of the Swiss NEAT concept (NEAT = new railway Alpine transversal). Scheduled…

read more…
Taiwan High Speed Rail, Design Lot D3

Taiwan High Speed Rail, Design Lot D3

Taiwan High Speed Rail, Design Lot D3 The 345 km long high-speed line has been connecting the cities of Taipei and Kaoshiung since 2007. About 300 km are located on bridges. Thirty tunnels were needed. The installation…

read more…
Mauvoisin II Hydropower Plant, Switzerland

Mauvoisin II Hydropower Plant, Switzerland

Mauvoisin II Hydropower Plant, Switzerland Die Kraftwerke Mauvoisin AG plante Mitte der 90-iger Jahre die Leistung der beste­henden Anlagen durch die neue Leistungsstufe Mau­voisin II um 550 MW auf insgesamt 902,5 MW…